1.Installation Instructions For Shower Pan With PVC Or ABS Drain

  1. Frame out shower stall area to shower pan dimensions.
  2. Sweep out any debris from sub floor.
  3. Test fit shower pan drain housing into sub floor bore hole.
  4. Make sure the shower pan is aligned properly and fits snuggly against the shower frame studs on all sides.
  5. This step depends on whether there is access to the drain connection from below the sub floor.
    1. If there is access from the sub floor below, then cut a section of drain pipe(PVC or ABS, as applicable to the type of drain) which is long enough to extend below the sub floor and easily make a connection to the waste water pipe.
    2. If there is no access from the sub floor below, then make sure the drainpipe stubbed up from the sub floor is adjusted to a height sufficient to fit properly into the shower pan drain connection.
  6. Put down a ½”to ¾” mortar bed on the entire framed in sub floor to the edge of the bore hole.
  7. Brush drain adhesive(PVC or ABS as applicable) inside the drain connection located at the bottom of the drain which is integrated into the shower pan, and
    1. If there is access from the sub floor below and you followed step 5.1. above, then brush PVC or ABS adhesive on the outside of the cut drain pipe and quickly insert into drain connection.
    2. If there is no access from the sub floor below and you followed step 5.2. above, then brush PVC or ABS adhesive on the drain pipe stubbed up from the sub floor.
  8. Set the shower pan carefully into the mortar bed and the drain housing into the bore hole in the sub floor.
    1. If there is access from the sub floor below and you followed installation steps 5.a. and 7.a. above, then be sure the drainpipe extends far enough below the sub floor so it can be conveniently connected to the waste water pipe following the installation.
    2. If there is no access from the sub floor below and you followed installation steps 5.b. and 7.b above, then quickly insert the stubbed up drain pipe properly into the shower pan drain.
  9. Firmly press the Tile Redi shower pan into place, making sure there is a good seal between the curb and the sub floor
  10. Make sure that the curb and each splash wall is level for proper drainage.
  11. Install the shower backer board and water proofing in accordance with the standards established by the Tile Council of North America, Inc.
  12. Seal and waterproof joint between backer board and the Tile Redi splash walls.
  13. Adjust the height of the drain as necessary to accommodate the ceramic tile or marble.
  14. Mix the approved Redi Poxy epoxy or other approved epoxy stone adhesive and trowel the epoxy to shower pan using an 1/8 inch trowel and set tiles directly in epoxy.
  15. Tile the rest of the shower.

Back to top




2.Tile Redi - Redi Niche™ Installation Guide

  1. Measure distance between vertical studs (studs usually on 16 inch centers)
  2. Measure and cut top and bottom horizontal support brackets to a length which permits
    each of them to run between, and be fastened to, both vertical studs.
  3. Level and mechanically fasten bottom horizontal support bracket to both of the adjacent
    vertical studs.
  4. Level and mechanically fastened the top horizontal support bracket to both of the
    adjacent vertical studs so that the vertical dimension between the horizontal support
    brackets matches the vertical dimension of the predrilled fastening holes on the Redi
    Niche.
  5. Please note: If the distance between the vertical studs is greater than the size of the
    Redi Niche™, you will need to attach additional vertical framing to one or both of the
    vertical studs to accommodate the size of the Redi Niche.
  6. Place the Redi Niche™ in between the support brackets.
  7. Level and mechanically fastened Redi Niche™ using one framing screw in each predrilled
    hole.
  8. Install your tile backer board around the Redi Niche™ so its in accordance with the
    industry standards.
  9. Take 100% waterproofing silicone and seal gap between backer board and the Redi
    Niche™ and seal the screw holes.
  10. Now apply your setting material and set your tile, marble or stone directly to Redi Niche
    surface.

Back to top




3.How to Use Tile Set (Redi Poxy EPOXY ADHESIVE)

  1. Mixing:
    Pour Redi Poxy Epoxy Adhesive Part A and Part B into a clean mixing pail and mix thoroughly. Add Redi Poxy Part C Filler Powder and mix to a smooth, trowelable consistency. Mortar is ready for use immediately after mixing.

  2. Packaging:
    Redi Poxy Epoxy Adhesive is Resin, hardener and filler powder.
  3. Unit Size:
    #1 Unit
    Weight: 12.6 lb. (5.7 kg) volume: 0.9 gals. (3.4 l)

  4. Approximate Coverage:
    #1 Unit
    With 1/8" x 1/8" (3 x 3 mm) square notch trowel
    • 45–55 sq. ft./4.2–5.1 m2

    With 1/4" x 1/4" (6 x 6 mm) square notch trowel
    • 15–18 sq. ft./1.4–1.7 m2

  5. Working Properties (70°F [21°C])
    • Pot Life 45 minutes
    • Time to Grout 12 hours
    • Time to Light Traffic 12 hours
    • Time to Heavy Traffic 24 hours
    • Minimum Application Layer 1/8 in (3 mm)
    • Maximum Application Layer 3/8 in (9 mm)
    • Wet Density 99 lbs/ft3 (1590 kg/m3)